NEW DRAIN LOCATION ON OUR PUMP FLANGE VALVE

Return to news

NEW DRAIN LOCATION ON OUR PUMP FLANGE VALVE

Nouvelles

16 January 2022 | Published by

At Calefactio, continuous improvement is the motto that drives us to surpass ourselves, and to offer you the top products on the market. Obviously, none of this would be possible without your precious collaboration and comments. This is why we quickly jumped into solution mode when we noticed the location of the drain on our pump flange wasn’t optimal.

We’re very pleased to announce that we’ve replaced one of the two side pressure gauge ports with a drain to make it easier to get at. You’ll therefore be able to continue the monitoring of your system (Delta P) and system maintenance.

Thanks to our full bore brass ball valves, you save both time and money while reducing the number of unions required. You also avoid the risk of potential leaks. And, when replacing the pump, you’ll be certain no air gets into your system.

Our Delta pump flanges are available for 4 types of connections (NPT, SWEAT, PRESS and F1960), and in 5 sizes (¾”, 1”, 1¼”, 1½”, 2”). They’re suitable for any type of pump, even high-velocity ones, and they’re sold individually, in master packs or in two-packs. Do note that pressure gauges are not included.

Our kits include the following:

  • 1 ΔP valve with drain + 1 pressure gauge port;
  • 1 ΔP valve with 2 pressure gauge ports on either side;
  • 2 seals;
  • 4 nuts & 4 bolts;
  • 4 x 1⁄8″ plugs (installed).

 

Contact your representative and order yours now!

You can also consult the brochure or download the technical sheets:

You might also like

New from Calefactio, CondenSAFE with pump for additional protection to the mechanical room.

Published by - 23 February 2021

In our mission to improve what’s best, we have taken into consideration that gravity is sometimes not on our side, so we have incorporated a water-resistant and dustproof pump into our Condensate Neutralizer to help pump neutralized water to the closest drain. Our CondenSAFE pump is enclosed in an acid-resistant (≥ Ph3) nylon glass plastic […]

Read more

New 4-in-1 hydraulic separator from Calefactio

Published by - 10 January 2024

In addition to isolating the primary circuit from the secondary circuit for heating and snow melting applications to prevent variations in flow rates and temperature, the new Calbalance 4-in-1 hydraulic separators from Calefactio separate water, air, dirt and ferrous debris. The coalescence process produced by the media allows air and micro-bubbles to fuse and then […]

Read more

Improve What’s Best

Published by - 23 September 2020

At Calefatio, we firmly believe in continuous improvement. We apply it in our products development, our relations, and each team member is encouraged to practice it in their field of expertise. Today, we are proud to show you a part of what it means concretely for us by presenting small ameliorations that we rencently made […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting