New Tankless Water Heater Valve Kit ¾″ PRESS design

Return to news

New Tankless Water Heater Valve Kit ¾″ PRESS design

Nouvelles

1 April 2024 | Published by

Calefactio adds a ¾” PRESS connection Tankless Water Heater Valve Kit including a 150 PSI pressure relief valve to its line.

Compact and easy to install, each Calefactio Tankless Water Heater Valve kits includes two isolation valves with drain and a 150 PSI pressure relief valve. Some kits are also offered with a 30 PSI pressure relief valve.

The drains and handles are designed to simplify maintenance of the system.

They are made of brass and certified lead free to ensure lasting durability.

tankless water heater valve press

Kits are offered with ¾” and 1” NPT, Press and Sweat connections including a pressure relief valve.

What if we added an expansion tank?

Unique on the market, the all-in-one tankless water heater service valve kit with expansion tank includes two isolation valves, a pressure relief valve, but also a union tee and an expansion tank.

tankless water heater valve with expansion tank

It absorbs the increased volume of water which results from the heating process, thereby keeping the system’s pressure below the relief valve setting. It also acts as a water hammer or shock absorber to absorb a sudden change in fluid velocity after the sudden closing of a faucet. An exclusive Calefactio product that simplifies the installation and maintenance of tankless water heaters under 2 gallons.

You might also like

Calefactio expands its 4-in-1 hydraulic separator line with a new brass model

Published by - 12 May 2025

Calefactio expands its line of 4-in-1 hydraulic separators with a brand-new brass model, engineered to maximize the performance of hydronic heating systems. This compact and durable unit not only isolates the primary and secondary circuits but also efficiently removes air, micro-bubbles, dirt, and ferrous debris from the fluid.       Equipped with a high-efficiency […]

Read more

Annual Inventory 2026 – Important Dates & Order Deadlines

Published by - 8 June 2026

As we prepare for our annual inventory, we would like to provide the following schedule to help you plan accordingly and ensure the best possible service.   Location Order Deadline* Inventory Count Return to Normal Operations Blainville Tuesday, June 23 June 29 – July 1 Thursday, July 2 Edmonton Tuesday, June 23 June 29 – […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting