A Calefactio installation

Return to news

A Calefactio installation

News

1 April 2019 | Published by

Calefactio participated in the design of this state of the art installation that includes a few of our products. This single-home in the Laurentians is heated at first by a coil diffusing heat thought a ventilation system, and a radiant heating system supports it as secondary system.

A high efficiency condensing boiler will heat the water  (140°F) that will be distributed in a coil within the ventilation ducting. This first stage of heating will have a “high” priority between the two thermostat input of the boiler. The boiler has also been configured to respect a certain priority delay.

The second thermostat input of the boiler will be dedicated to the radiant heating system which will adjust the water set point according to exterior temperature.

The variable speed pump will provide sufficient cirulation to all manifolds. This same pump will automatically adjust the flow depending on the actuators openings or closings.

This system is also equipped with devices allowing remote control (gateway).

A lot of Calefactio products were needed for this system such as CondenSAFEΔP pump flanges, Calbalance, HGT Series expansion tank, three Caltherm Pro manifolds and actuators.

You might also like

2020 Inventory

Published by - 22 May 2020

Due to our yearly inventory, our offices will be closed next June 22. Please note that no shipping or receiving will take place over that day. In prevision of this temporary closing, make sure to prepare your orders for this period by June 19. Thank you for your collaboration, Calefactio’s Team

Read more

NEW DIELECTRIC DOUBLE FLANGED CHECK

Published by - 17 February 2025

The dielectric double flanged check from Calefactio is designed to enhance the reliability of pumping systems. Compatible with a wide range of pumps (from ¾˝ to 1 ½˝), it ensures smooth fluid circulation while effectively preventing backflow. Thanks to its rotating flange with dielectric insulation, it prevents corrosion and protects the entire system. Its robust […]

Read more

Calefactio is on the move!

Published by - 17 March 2022

Already 7 months have elapsed since the construction work started on our new head office. With that we will be able to provide increased office and warehouse space that will better facilitate better logistics and customer service. A major project that will allow us to pursue our growth in the coming years, but also to offer more […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting