Less Installation Time, Fewer Leaks: Discover the New Calefactio Service Valve with Union

Return to news

Less Installation Time, Fewer Leaks: Discover the New Calefactio Service Valve with Union

Nouvelles

29 May 2026 | Published by

Designed for vertical tanks, boilers, and plate heat exchangers, the new Calefactio service valve with union simplifies hydronic installations while reducing costs and the risk of leaks. Its compact design allows for faster installation and valuable space savings in mechanical rooms.

View product documentation and specifications ­>

service-valve-union-calefactio-tank-boiler (2)

The integrated union makes maintenance easier, while the built-in drain simplifies tank draining. The valve is also equipped with a lockable handle that can be secured with a padlock, as well as a pressure gauge port. By reducing the number of joints and fittings required, it directly helps minimize the risk of leaks while providing a cleaner, more reliable, and longer-lasting installation.

service-valve-union-calefactio-tank-boiler (5)

Every additional fitting means more time on the job site, higher labor costs, and greater potential for leaks over time. By integrating multiple functions into one compact unit, the Calefactio service valve with union significantly reduces assembly time and simplifies the installer’s work.

Fewer fittings also mean less maintenance time. The integrated union allows components to be removed or replaced without dismantling the entire piping system, making servicing much faster and more efficient. Its compact format also helps optimize space in installations where every inch matters.

service-valve-union-calefactio-tank-boiler (5)

Made from lead-free forged brass, this valve combines durability, reliability, and ease of installation. Available with ¾˝ to 1½˝ NPT connections.

With this new solution, Calefactio helps professionals save time, reduce installation costs, and minimize the risk of leaks right from the start.

You might also like

Mini-Entepôts St-Jean counts on Calefactio

Published by - 25 September 2019

Plomberie Claude Boulet recently completed a 14 000 sq ft radiant heating project for Mini-Entrepôts St-Jean. The design and material supply was made in collaboration with Pier-Rick Rodier Rochefort from Empire Canada. In order to cover the whole heating demand of this surface, 12 000 ft of Calpex –R 5/8 and 7000 ft of Calpex-R ½ tubing were required, […]

Read more

Celebrating 10 years of expansion: $50,000 in prizes to giveaway!

Published by - 4 August 2023

Calefactio is celebrating its 10th anniversary this year and that’s why the company has decided to give some presents plumbers and contractors across Canada by including random scratch tickets in their products this fall. The good news is that they are all winners! $50,000 in prizes will be give in to customers to thank them […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting