A Calefactio installation

Return to news

A Calefactio installation

News

1 April 2019 | Published by

Calefactio participated in the design of this state of the art installation that includes a few of our products. This single-home in the Laurentians is heated at first by a coil diffusing heat thought a ventilation system, and a radiant heating system supports it as secondary system.

A high efficiency condensing boiler will heat the water  (140°F) that will be distributed in a coil within the ventilation ducting. This first stage of heating will have a “high” priority between the two thermostat input of the boiler. The boiler has also been configured to respect a certain priority delay.

The second thermostat input of the boiler will be dedicated to the radiant heating system which will adjust the water set point according to exterior temperature.

The variable speed pump will provide sufficient cirulation to all manifolds. This same pump will automatically adjust the flow depending on the actuators openings or closings.

This system is also equipped with devices allowing remote control (gateway).

A lot of Calefactio products were needed for this system such as CondenSAFEΔP pump flanges, Calbalance, HGT Series expansion tank, three Caltherm Pro manifolds and actuators.

You might also like

2020 Inventory

Published by - 22 May 2020

Due to our yearly inventory, our offices will be closed next June 22. Please note that no shipping or receiving will take place over that day. In prevision of this temporary closing, make sure to prepare your orders for this period by June 19. Thank you for your collaboration, Calefactio’s Team

Read more

Meet The Staff – Anouchka Clairet

Published by - 7 October 2019

Anouchka si an accounting technician at Calefactio. She is in charge of billing and carry out administrative support tasks. She has an excellent capacity at seeing the big pictures of the different projects she words on, allowing her to meticulously plan each step. When you ask her what fits her at Calefactio, she answers that […]

Read more

COVID-19 : update on our operations

Published by - 2 April 2020

Last week, we notified you that we would adjust our operations following the Quebec Government order to close of all non-essential stores and services starting at midnight tonight up until April 13. Despite this measure, we adjusted our operations to remain available for our clients through email as teleworking and online trade are authorized. We invite you […]

Read more

NEW !

Hydronic Radiant Floor Heating & Snow Melting